Day 1
first half of work done
first half of work done
this is what we have been able to do for the first half of the day due to major draw backs (lets say the sand was not the kind that we have expected from that area). so it took some time to get the materials and even tools needed to start cementing. thanks to Samsul for guiding us through the cementing process and doing the cementing too! honestly, i learned a lot and without him i don't think we would get that far for the first half.
second half of work done
first, second and third layer has been cemented. angle iron is well fit for the finishing touches on the next construction day.
we started as soon as possible after the short break. we replicated what was done in the first half and just continued along til 5pm. we stopped till the last of the 3rd layer was done. angle iron's security feature seems very promising. the rain has got me worried about the structure at the moment. anyways, i must not think about that, what's important now is the materials we need to fill in it for the next construction day.
8am, Sunday, 22nd February 2009
(confirmed)
MATERIALS needed:
CONSTRUCTION DAY 2
8am, Sunday, 22nd February 2009
(confirmed)
MATERIALS needed:
- for fill - bricks/broken bricks and good size stones/pebbles
- usual stuff - cement/water/sand.
- make inner brick layers (maybe done tomorrow)
- finish off 4th layer
- apply fill on one compartment at a time. (or apply to all assuming there are enough materials)
- adjusting angle irons
- final fill.
8am, Sunday, 22nd February 2009