Project: Manual Pad - Set Back

By Danial · On Sunday, March 15, 2009


MANUAL PAD

is TEMPORARILY
OUT OF SERVICE

unfortunately due to the rain that hit us on the night when the plastering was done, it has damaged and distorted the cement mix. and so, it end up with crusty surfaces like biscuits.

to be more specific, the cement was separated from the sand, cement was floating while the sand sank down hence giving the brittle and fragile surface.

anyways, it is a lesson learned. always put weather as a crucial factor that it either can speed up the drying process or it can completely ruin a days work.

if we leave it the way it is now, its definitely going to be ruined. so we're gonna repair it.

and FYI, me and Nas is doing the repair work, so no worries. i really want this to get over with ASAP coz i wanna study... and sk8 too!

MANUAL PAD
is TEMPORARILY
OUT OF SERVICE


I'm really hoping the weather would be good so the repair work and drying would be ok. if the weather continues to be rainy, i'd give it 2-3days. if the weather is hot, then just 24 hours would do, just like the ledge.

Projects
Share

DANIAL OTHMAN

Praesent posuere libero eu justo tristique, vitae ultricies justo volutpat. Sed pellentesque neque eu neque adipiscing condimentum. In hac habitasse platea dictumst. Aliquam fermentum mollis orci aliquam dictum. I love skateboarding.

You Might Also Like

  • Popular
  • Smell The Street Skateshop (Brunei)

  • Uneek Skateshop (Brunei)

  • Muara Beach Skate Park

  • Youth Park Skate Park

  • Video: August Instagram

Latest

  • Home
  • About
  • Features
  • Contact

About Us


Categories

  • Events (9)
  • Projects (20)
  • Skateparks (2)
  • Skateshops (2)

Popular Posts

  • Smell The Street Skateshop (Brunei)

  • Uneek Skateshop (Brunei)

  • Muara Beach Skate Park

Search

© Skatedium 2015.